UC Davis Health understands construction can have an impact on nearby neighbors. To better inform residents about upcoming work outside of regular hours information will be posted to this webpage.
Please note that schedules are subject to change due to weather conditions and resource availability. The construction teams remain committed to maintaining the presented timelines to the best of their ability.
After-Hour Construction Activity
Project Name: California Tower
- Work Location: X and 45th Streets
- Work Being Conducted: Gravel and slab on metal deck concrete pours
- Work Date(s):
- Mar. 9, 10, 12, 13, 17, 18, 20, 23, 24, 26, 27, and 31
- Apr. 1, 6, 7, 13, 14, 15, 16, 20, 21, 23, 24, and 27
- May 1, 4, 5, 7, 11, 15, and 22
- Jun. 11
- Time Frame: Gates open at 3 a.m. and concrete pours start at 4 a.m.
- Important Project Notes: Potential dust and noise. Dust control plan, noise and lighting mitigations measures will be implemented.
- All trucks will use white sound backup alarms.
- Majority of pours will occur in the early morning during low traffic times.
- Concrete pump will remain on ground level for all pours.
- Flaggers in place to assist trucks.
- This work will:
- Prevent delays to ambulance traffic at the hospital.
- Avoid high traffic times and prevent traffic impacts from concrete and gravel trucks when many staff and patient vehicles are present.
Project Name: California Tower
- Work Location: X and 45th Streets
- Work Being Conducted: Cranes will be used to conduct night stocking activities by placing materials on the Tower structure floors.
- Work Date(s): Weekdays, Jan. through May 2026
- Time Frame: 6 p.m. to 11 p.m.
- Important Project Notes: Second shift is being conducted in the evenings to free up cranes for day construction. Noise mitigation measures will be implemented.
Project Name: Central Utility Plant Expansion (CUPx)
- Work Location: X Street and Entrance/Exit at Parking Structure 5
- Work Being Conducted: CUPx team will perform underground utility work on X Street at the Parking Structure 5 entrance and exit, resulting in closure and modified traffic flow at the Cancer Center valet.
- Work Date(s): Postponed
- Time Frame: 6 p.m. to 2 a.m.
- Important Project Notes: Potential noise, most impactful work will be done at the start of shift.
- This work will:
- Prevent delays to ambulance traffic at the hospital
- Avoid high traffic times for the UC Davis Health campus when many EMS, staff, and patient vehicles are present.
Weekend Construction Activity
Project Name: California Tower
- Work Location: X and 45th Streets
- Work Being Conducted:
- Saturday: Work will include welding deck level 15 and penthouse, preparation for concrete pour on level 1, standpipe installation, overhead and in wall rough in level 3, plumbing installation, and scaffold install and take down.
- Sunday: Work will include managing storm water with site dewatering.
- Work Date(s): Saturday, April 18, 2026 and Sunday, April 19, 2026
- Time Frame: Saturday, 7 a.m. to 6 p.m. and Sunday, 9 a.m. to 6 p.m.
- Important Project Notes: No anticipated work impacts. Noise mitigation measures will be implemented.
Project Name: Central Utility Plant Expansion (CUPx)
- Work Location: X Street and Entrance/Exit at Parking Structure 5
- Work Being Conducted: CUPx team will perform underground utility work on X Street at the Parking Structure 5 entrance and exit, resulting in closure and traffic flow modifications at the Cancer Center valet.
- Work Date(s): Sunday, April 19, 2026
- Time Frame: 9 a.m. to 5 p.m.
- Important Project Notes: No anticipated work impacts. Noise mitigation measures will be implemented. Flaggers will be in place to assist in traffic flow.
Additional Resources